Skip To Main Content

desktop-menu

header-container

right-container

decorative-image

decorative-image-desktop

mobile-menu

mobile-top-container

mobile-cta-nav

mobile-main-nav

decorative-image

decorative-image-mobile

fixed-header

logo-container

logo-image

right-container

cta-nav

header-container

logo-container

logo-image

right-container

district-nav

header-portals-nav

translate-container

search-container

search-popup

cta-nav

Breadcrumb

Facilities Studies

During the 2022-23 school year, PSD contracted with McKinstry Essention LLC, an independent third party, to conduct a thorough analysis of the district’s buildings and systems. This analysis includes creation of a comprehensive facility condition assessment (FCA), a feasibility study specific to the possible installation of solar energy options at schools, a feasibility study specific to the possible installation of air conditioning in schools, and a retrocommissioning study.

The findings of these studies will be shared publicly in PSD Board of Education meetings throughout the 2023-24 school year. PSD will use the information presented in these studies to inform long-term planning associated with the maintenance of our facilities. 

Solar Study

Air Conditioning Feasibility Study

Retro Commissioning Study 

  • Progress update to the Board of Education, Dec. 12, 2023

Facility Condition Assessment Study

Facilities Condition Assessments by School